Email icon
info@cdms-ltd.co.uk
Call icon
0800 774 7998
Commercial Door Maintenance & Security Logo
"The Preferred Door Company"
0800 774 7998
Call and speak to an engineer, not a call centre!
Menu
24/7 Fast Response | Fully Compliant | Nationwide
job Main Photo

Commercial Aluminium Door Repairs & Fire Safety Compliance for JLL Fitness, Birmingham

Aluminium Door Repair & Compliance Upgrade.

Learn more
Back

Double Aluminium Door Repair, Birmingham

Commercial Door Maintenance and Security Ltd was instructed to carry out specialist repair and compliance works to two aluminium entrance door sets at JLL Fitness in Birmingham. The project focused on restoring safe operation, improving control of pedestrian flow, and ensuring fire regulation compliance within a live fitness environment. As the doors formed a key access point for staff and members, all works were carefully planned to maintain continuous use of the facility while delivering long-term reliability and safety.

Hold-Open Closer Replacement & Fire Regulation Compliance
The main entrance doors required the replacement of hold-open transom closers that had reached the end of their service life. These closers were critical to daily operation, allowing controlled access while ensuring the doors would release correctly under fire alarm activation. In addition, the inner aluminium door set, which opened outwards only, required upgrading to a fire-regulation-compliant specification. This involved installing appropriate hardware to meet current fire safety standards while maintaining smooth operation and compatibility with the existing door system.

commercial door repair photo
aluminium door repair photo
Project photo 3

"True expertise shows when modern safety standards meet legacy systems — delivering solutions that protect people today while respecting the structures of yesterday."

Retro-Fitting Obsolete Transom Hardware

Both door sets were originally fitted with 190s Jackson transom closers — a manufacturer that ceased trading decades ago — making direct replacement impossible. Our engineers carried out a detailed assessment and designed a retrofit solution using modern, compliant transom closers that matched the door geometry and operational requirements. This spurious part replacement required precision adaptation to ensure correct alignment, reliable performance, and a professional finish, all without compromising the integrity or appearance of the aluminium door frames.

Daytime Working with Safety as a Priority
All works were completed during normal operating hours, meaning safety management was paramount throughout the project. Barriers, signage, and controlled work zones were implemented to protect members of the public and staff while allowing the fitness facility to remain fully operational. Through careful coordination and experienced on-site management, the repairs were completed efficiently, safely, and with minimal disruption, resulting in compliant, well-controlled aluminium doors that now operate exactly as intended.

If you want our help:

Call Now

Get in touch

Head Office:
Commercial Door Maintenance and Security Ltd
61 Bridge Street,
Kington,
HR5 3DJ

t: 0800 774 7998
e: info@cdms-ltd.co.uk

Office Hours

Mon - Sat: 8am - 10pm
Sun: Closed

© 2026, Commercial Door Maintenance and Security Ltd. All rights reserved.